EasyManua.ls Logo

MBRAUN LABmaster pro sp - Maintenance Works; Glovebox

MBRAUN LABmaster pro sp
302 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 Maintenance
Maintenance works
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
Page
12 - 11
12.6 Maintenance works
12.6.1 Glovebox
Preparations
Observe section Maintenance contract with MBRAUN [}12 - 8].
Standard boxes and antechambers with a total volume of up to 6 m³ (only with use of
non-hazardous gases (N
2
) and process materials):
Ensure sufficient ventilation of the room.
Open the outer antechamber door and let the antechamber atmosphere escape
slowly.
Then open the inner antechamber door.
Wait some minutes before you refill the box with ambient air (the time depends on
the box volume).
Open the box panes/doors.
Special systems: with use of large-volume boxes, hazardous gases and process
materials
In general, these systems are equipped with an air purge function.
Preparations
> The system and the analysers are switched on.
> The exhaust is connected to an in-house exhaust system.
Start air purging.
ð The doors are released if the O
2
content is higher than 19%.
Open the box panes/doors.
Perform maintenance work.
Replace the valves.
Plug-in or replace the analysers.
Cleaning the box window
Clean the exterior using conventional detergents (do not use caustic detergents). For this
purpose, use a soft, lint-free cloth, or a vacuum cleaner with brush attachment, if avail-
able.
Checking the overpressure safety valve
Cyclical check of the overpressure control valve
The overpressure control valve is an optional feature. It checks the function of the over-
pressure safety valve (OSV) at the glovebox.

Table of Contents

Related product manuals