EasyManua.ls Logo

MBRAUN LABmaster pro sp - Reactor Regeneration

MBRAUN LABmaster pro sp
302 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Gas purifier operation
Regeneration operation
Page
7 - 18
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
7.5.2 Reactor regeneration
Manual activation / deactivating of a reactor regeneration
Prerequisites
¡ A sufficient quantity of regeneration gas is available.
¡ The reactor that is to be regenerated is out of circulation.
¡ The vacuum pump is activated.
¡ No manual antechamber cycle is allowed during the subsequent regeneration period.
¡ Condensate is trapped into a bottle or the like.
Activating regeneration (example double purifier, dp)
Start Screen Functions
Reactor 2 is to be regen-
erated:
Touch the Regener-
ation Reactor 2 but-
ton.
ð A confirmation dia-
logue 1 is displayed
(see figure below).
Reactor 1 is to be regen-
erated:
Touch the Regener-
ation Reactor 1 but-
ton.
ð The system reaction
is like reactor 1 regen-
eration.
Confirmation dialogue 1:
Touch “Yes”.
ð Confirmation dialogue1 disappears.
ð Confirmation dialogue2 is displayed.
Confirmation dialogue2

Table of Contents

Related product manuals