4 Transport, installation and commissioning
Installation
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
Page
4 - 29
4.2.7 Installation of the analysers
Installation example MOB Box MB-MOD200
Installation example MB-LABmaster
Workstation
Installation Example for a 3
rd
party glovebox/enclos-
ure
1 Oxygen analyser 2 Moisture analyser
Oxygen and moisture analysers are mounted with a vacuum-tight KF40 flange, using a
centre ring and clamp.
► Fit the MB-OX-SE1 analyser into the outlet pipework, using the tri- clamp flange and
centre ring. It must be downstream always the first analyser, the circulating gas
passes through.