4 Transport, installation and commissioning
Installation
Page
4 - 28
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
MOD box
► Attach the earthing cable of the MOD box to the M8 bolt of the main grounding bus
bar system.
Workstation LABmaster
► Attach the grounding cable of the workstation LABmaster to the screw of the
provided bolt of the main grounding bus bar system.