EasyManua.ls Logo

MBRAUN LABmaster pro sp - Page 46

MBRAUN LABmaster pro sp
302 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Inert gas technology
Functional description
Page
2 - 24
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
Unloading cycle
Glovebox/enclosure Antechamber
1 Antechamber filled with glove-
box/enclosure atmosphere
(equal gas and pressure)
2 Open inner door.
Transfer material into ante-
chamber.
3 Close inner door. 4 Open outer door.
ð Antechamber is filled with
ambient air.
Transfer material to out-
side.
In case of hazardous material or a hazardous atmosphere inside the glovebox, special
safety measures (including e.g. an antechamber cycle) are mandatory. They may not be
part of a standard system.
Antechamber after system downtime
After a lengthy downtime of the system, permeation and diffusion has filled the antecham-
ber with ambient air.
Make a full antechamber cycle (3x evacuate plus refill) prior to start operating the
antechamber.

Table of Contents

Related product manuals