6 - 22
6.3 Preparatory Procedure and Setting
6
PREPARATORY PROCEDURES AND SETTING
(b) GX Works2/GX Developer and SW3PVC-CCPU
When performing troubleshooting according to the CC-Link IE controller network
module manual, actions to be taken with GX Works2/GX Developer are as
follows.
Table 6.4 GX Works2/GX Developer and SW3PVC-CCPU
GX Works2/GX Developer SW3PVC-CCPU
CC IE Control Network Diagnostics
Use the CC-Link IE Controller Network diagnostics result
screen of CC IE Control utility.
PLC diagnostics
Use the System information screen of C Controller setting
utility.
Error code check
Check the Module information tab or System information
screen of C Controller setting utility for error.
Sequence program check Check the user program for error.
Device test Use Device monitoring utility.
Device batch monitor Use Device monitoring utility.
Network parameter Use the Parameter settings tab of CC IE Control utility.
Network range assignment
Use the Network range assignment screen of CC IE Control
utility.
H/W test Use the Parameter settings screen of CC IE Control utility.
Refresh parameters
Use the Refresh parameter settings screen of CC IE Control
utility.
Link start/stop Use the Link start/stop screen of CC IE Control utility.
Routing parameters
Use the Routing parameter settings screen of CC IE Control
utility.
Circuit test Use the Parameter settings screen of CC IE Control utility.
Test between station Use the Parameter settings screen of CC IE Control utility.
Communication test Use the Communication test screen of CC IE Control utility.
Self-loopback test Use the Parameter settings screen of CC IE Control utility.