Chapter 2  Installation and Configuration
Rack Mounting the SuperLoader
SuperLoader User’s Guide 19
General 
Preparation for 
Rack Mount 
Installation 2
Take the following general safety steps before beginning either rack 
mount installation.
1 Lower the cabinet feet.
2 Extend the cabinet anti-tip device, if available.
3 Ensure that the cabinet and all rack mounted equipment have a 
reliable ground connection.
4 Verify that the total current of all rack mounted components 
(including the SuperLoader) will not exceed the current rating of the 
power distribution unit or outlet receptacles.
5 Secure the help of at least one other person. At least two people are 
required to safely install the SuperLoader into a rack cabinet.
Stationary Rack 
Mount Installation 2
This section describes the steps for attaching the SuperLoader directly to 
the rails of a rack.
1 Make sure you have the following tools and parts:
• #2 PHILLIPS
®
 screwdriver
• Level
• The following SuperLoader accessory kit parts (see figure 11
):
• Four SuperLoader brackets (two long and two short to 
accommodate different rack depths)
Use the short SuperLoader brackets (74-60604-03) unless the 
distance from the front mounting rail to the rear mounting 
rail is less than 30.25 in. (76.84 cm).
• Two support brackets (74-60605-01)
• Eight 10-32 x 1/4 inch button head screws for the support 
brackets (four per support bracket)
Warning: Failure to take these safety steps may result in 
personal injury or equipment damage.
Caution: Do not remove the top cover of the SuperLoader 
during the installation process. Removing the top 
cover could result in damage to the SuperLoader.