Chapter 2  Installation and Configuration
Powering On the SuperLoader
SuperLoader User’s Guide 29
Once the power-on sequence completes and the SuperLoader is 
ready, the LCD lists the SuperLoader options that are present and the 
Ready LED is steady green.
Figure 19  Sample Idle 
Screen Display 
(SuperLoader LTO 
illustrated)
2 When you first power on the SuperLoader, it automatically runs a 
POST. During the POST, the left (green) LED flashes. After the POST, 
the left (green) and right (amber) LED flash alternately back and 
forth. Do one of the following:
• If the SuperLoader powers on successfully, continue configuring 
the SuperLoader (see Configuration
).
Note: When the SuperLoader is idle for a while, the company 
logo appears, the LCD backlight turns off (into power-save 
mode), and the drive type (if known) or the date and time 
appears. 
Note: After powering up the SuperLoader using the method 
described above, you should use the switch on the front to 
power off and on the SuperLoader.
HP Ultrium