Brooks Marathon Express
229 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Installation Marathon Express
Installation Procedure Part Number: 605914 Rev. B
Remove Protective Packaging
ThemodulesoftheMarathonExpressareshippedwiththeirinternalcomponents(robot,aligner,
etc.)coveredinprotectivepackaging.Thispackagingmustberemovedbeforeinstallationcanbe
started.
MarathonExpressModule
Removeprotectivewrappingfromanyloosecableendsorconnectors.
VCEModule(s)
Removeprotectivewrappingfromanyloosecableendsorconnectors.
RackMountableEquipment
Removeprotectivewrappingfromanyloosecableendsorconnectors.
Removing Shipping Brackets
ThemodulesoftheMarathonExpressareshippedwithshippingbracketsattachedtothem,which
protecttheirmovingpartsandprovideeaseofmovementofthemodules.Theseshippingbrackets
mustberemovedbeforetheMXsystemmaybeinstalledorused.
NOTE: Savetheshippingbracketsforpossiblefutureuse.Ifanyofthemodulesofthe
MarathonExpressarereturnedtoBrooksforserviceorshippedtoanotherlocation,
theoriginalshippingbracketsmustbeused.RefertoAppendixF:"Packingand
ShippingInstructions"onpage224.
MarathonExpressVacuumBackEnd
Therobotarmsaresecuredinplaceforprotectionduringshipment.Theseshippingbracketsmust
beremovedbeforeattemptingtooperatetherobot.
Step Action
1.
Removeallmountingboltssecuringthelidtothechamber.
2.
Raisethelidfromthetopofthevacuumchamberbyturningthewheelonthelidlifter.Refertothe"Lid
Lockout/TagoutProcedure"onpage43.