3. Installation Marathon Express
Unpacking and Inspection Part Number: 605914 Rev. B
Procedure Category
Type1Procedure:Equipmentisfullyde-energized.
Required Tools and Equipment
l
Forktruckorappropriateliftwithbumperstops
l
Openendwrenches,adjustableorsize19mm,3/4in,and11/8in
l
Metrichexwrenches
Unpacking Instructions
Step Action
1.
Uponreceivingthecrate,inspecttheindicatorsfordisturbance.Also,visuallyverifycrateisnotdam-
aged.InformfreightcarrierandBrooksAutomationofanyinspectiondiscrepancy.
2.
Removethecoverofeachshippingcrate.Inspectandverifycontents.
TheMarathonExpressAcceptanceTest(ATP)isincludedintheshipmentandisapermanentrecord
ofthesystemasitwasmanufacturedbyBrooksAutomation.Inadditiontoprovidinginformation
aboutserialnumber,modelnumber,androbotstationassignments,italsoprovidescriticaldata.
Makecopiesoftheformandkeepacopyclosetothesystem.Shouldmaintenanceberequired,data
fromtheATPmaybeneeded.
3.
RemovethecratewallsoftheTransportChamber.
4.
Unboltthecasterbracketsfromthepalletfloor(3places).
NOTE: Savetheshippingcrateforpossiblefutureuse.IftheMarathonExpressisreturnedto
Brooksforserviceorshippedtoanotherlocation,theoriginalshippingcrateandbracketsmustbe
used.
58
Copyright © 2023, Brooks Automation, Inc.