4 Transport, installation and commissioning
Installation
Page
4 - 22
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
WARNING
Working with hazardous materials
Prepare during installation the system for hazardous material (if applicable)
► Conduct a hazard analysis (and if necessary) a risk analysis.
► Take measure for save handling of processes / process materials according to the
output.
► Specify measures for behaviour in case of emergency (fire, escape of inert gas, elec-
trical failure).
► Summarize, if necessary, the result in a standard operation procedure (SOP).
► Train the operator for working with hazardous material.
CAUTION
Opening a glovebox with hazardous material / gases for expansion
Risk of injury through hazardous materials and gases
► Do a risk assessment of gases and materials and read the Safety materials data
sheets prior to start installation.
► Install appropriate safety measures prior to start installation.
Installation of a gas purifier and a glovebox
1 Feedthroughs 2 Gas inlet pipe of the glovebox
3 Vacuum pump 4 Exhaust connection