Cablelayoutandinterconnections
ConnectingtheOperatingPanelPowerSupplytothe
ProcessorUnit
Purpose
Inordertofacilitatethesonar'son/off
function,theOperatingPanelmust
befedapermanentstand-bypower.
Thissupplypowerisprovidedby
asmallcommercialpowersupply
connectedtotherearsideofthe
ProcessorUnit.IftheACmains
connectoronthecabledoesnott,
replaceitwithasuitableconnector.
ThemainsvoltagefortheOperating
PanelPowerSupplyis115or230
Vac,anditwillautomaticallysensethecurrentsupplyvoltage.
Cableidentiers
TheACmainscableisSU90/C05,whiletheDCendisSU90/C04.
Relatedtopics
•Cableplanonpage93
•Listofcablesonpage95
•ACmainswithIEC320/C7inlineplugonpage298
•OperatingPanelpowersupplyonpage299
Procedure
1Securethepowersupplyunitinastableposition.
2ConnectthepowersupplytotheACmainsusingthecableprovided.
3InserttheDCplugintothesocketontheappropriatecircuitboardontherearside
oftheProcessorUnit.
ThecircuitboardislocatedinslotG.
4Securethecablestopreventthemfromaccidentallydisconnectingduringheavy
seas.
381293/A
105

Table of Contents

Other manuals for Simrad SU90

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Simrad SU90 and is the answer not in the manual?

Simrad SU90 Specifications

General IconGeneral
BrandSimrad
ModelSU90
CategorySonar
LanguageEnglish

Related product manuals