Generalsupplyconditions
ThefollowinggeneralsupplyconditionsapplytothisSimradSU90delivery.
Topics
•Equipmentresponsibilityonpage31
•Receipt,unpackingandstorageonpage31
Equipmentresponsibility
Theshipyardperformingtheinstallationand/orequipmentdealerbecomesfully
responsiblefortheequipmentuponreceiptunlessotherwisestatedinthecontract.
Thedurationofresponsibilityincludes:
•Theperiodoftimetheequipmentisstoredlocallybeforeinstallation.
•Duringtheentireinstallationprocess.
•Whilecommissioningtheequipment.
•Theperiodoftimebetweencommissioningandthenalacceptanceoftheequipment
bytheenduser(normallytheownerofthevesselwhichtheequipmenthasbeen
installed).
Unlessotherarrangementshavebeenmadeinthecontract,theSimradSU90guarantee
period(asspeciedinthecontract)beginswhentheacceptancedocumentshavebeen
signed
Receipt,unpackingandstorage
Uponacceptingshipmentoftheequipment,theshipyardand/orthedealershouldensure
thatthedeliveryiscompleteandinspecteachshippingcontainerforevidenceofphysical
damage.Ifthisinspectionrevealsanyindicationofcrushing,dropping,immersionin
wateroranyotherformofdamage,therecipientshouldrequestthatarepresentative
fromthecompanyusedtotransporttheequipmentbepresentduringunpacking.
Allequipmentmustbeinspectedforphysicaldamage,i.e.brokencontrolsandindicators,
dents,scratchesetc.duringunpacking.Ifanydamagetotheequipmentisdiscovered,the
recipientshouldnotifyboththetransportationcompanyandKongsbergMaritimesothat
KongsbergMaritimecanarrangeforreplacementorrepairofthedamagedequipment.
Onceunpacked,theequipmentmustbestoredinacontrolledenvironmentwithan
atmospherefreeofcorrosiveagents,excessivehumidityortemperatureextremes.The
equipmentmustbecoveredtoprotectitfromdustandotherformsofcontamination
whenstored.
Formoreinformation,seetheinformationrelatedtoequipmenthandling.
Relatedtopics
•Equipmenthandlingonpage273