EasyManua.ls Logo

TECO A510s - Communication Control; PLC Control

TECO A510s
519 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-89
Note: Terminal S1, S2 and S5 must be closed for a minimum of 50ms to activate operation.
Note: The inverter will display SE2 error when input terminals S1-S8 is set to 53 and 26 simultaneously.
00-02=2: Communication control
The inverter is controlled by the RS-485 port. Refer to parameter group 9 for communication setup.
00-02=3: PLC control
The inverter is controlled by the inverter built-in PLC logic. Refer to section 4.5.

Table of Contents

Related product manuals