EasyManua.ls Logo

Brooks Marathon Express - Page 77

Brooks Marathon Express
229 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Brooks Automation 3. Installation
Part Number: 605914 Rev. B Installation Procedure
Argon
ArgonmaybeconnectedtotheMarathonExpressintheoptionalTopCooler.A1/4inchVCR
connectionmaybeprovidedontheMXsystemontheGasFacilitiesPanel,oritmaybeprovidedon
theTopCooler.Referto"FacilitiesSpecifications"onpage21forargongasrequirements.Ensure
thattheargonconnectionisfortheappropriatepressure.
DonotturnontheargonsupplyuntilallconnectionstotheMarathonExpressandallinstallationprocedureshave
beencompleted.
Step Action
1.
ConnecttheargonlinefromthefacilitytotheargonconnectionontheMXsystem’sTopCooleras
showninFigure3-6.
Vacuum
AnappropriateusersuppliedvacuumsystemmustbeconnectedtotheMarathonExpressVacuum
BackEndtoprovidethedesiredpump-downtimesforthevacuumchambers.Referto"Facilities
Specifications"onpage21forvacuumrequirementsandFigure3-5.
DependingupontheconfigurationoftheMarathonExpress,differentialvacuummayneedtobe
suppliedtovarioussealsincludingtheTopLignervacuumalignerandtheVacuumCassette
Elevatorsforproperoperationoftheseunits.Ifdifferentialvacuumisrequireditistakendirectlyoff
oftheroughingvacuumline,nouserconnectionisrequired.
DonotturnonthevacuumconnectionuntilallconnectionstotheMarathonExpressandallinstallationpro-
cedureshavebeencompleted.
Step Action
1.
Connectthefacility’srough-vacuumsystemtotheMarathonExpress.
Copyright © 2023, Brooks Automation, Inc.
77

Table of Contents

Related product manuals