of the extractor clips toward the outside edges of the router to release the Routing
Engine. Grasp both sides of the Routing Engine and slide it evenly out of the FEB.
8. Replace the Routing Engine in the FEB.
Align the rear of the unit with the guides inside the chassis. Slide the Routing Engine
all the way in until it contacts the connectors on the FEB. Flip the ends of the extractor
clips toward the center of the router to seat the Routing Engine onto the FEB. Using
a screwdriver, tighten the screws on the outside edges of the extractor clips. Slide the
Routing Engine into the slot evenly.
9. Use both hands to grasp the front of the replacement FEB that works and align the
rear of the FEB with the guides on the chassis.
10. To ensure proper seating of the ejector levers, move them to an outward position
slightly less than perpendicular to the faceplate before seating the FEB in the slot.
11. Slide the FEB all the way into the chassis until it contacts the midplane.
12. Grasp the ejector levers and carefully push the FEB to seat it onto the midplane.
13. Flip the ejector levers toward each other to lodge the FEB in place.
Related
Documentation
Checklist for Monitoring the FEB on page 553•
Obtain FEB Hardware Information
To obtain FEB hardware information:
1.
Display the FEB Hardware Information on page 559
2.
Display the FEB Firmware Information on page 560
3.
Locate the FEB Serial Number ID Label on page 560
Display the FEB Hardware Information
Purpose To obtain information about the FEB hardware.
Action To display the FEB hardware information, use the following command:
user@host> show chassis hardware
Sample Output
user@host> show chassis hardware
Hardware inventory:
Item Version Part number Serial number Description
Chassis 50974 M10
Midplane REV 03 710-001950 HA9949
Power Supply A Rev 03 740-002498 LK33316 DC
Display REV 04 710-001995 HB2079
Routing Engine a000000792cd0a01 RE-2.0
FEB REV 11 710-001948 HE6497 Internet Processor II
[...Output truncated...]
559Copyright © 2012, Juniper Networks, Inc.
Chapter 27: Monitoring the FEB