SECTION 4 - SCHEDULED MAINTENANCE
CURSOR SERIES
Base - 03/2015 Print P4D32C006 E
NOTE The scheduled maintenance operations are only valid if the fitter observes all installation regulations provided by
FPT.
Furthermore, the fitted appliances must always be in compliance with the torque, power and engine speed for which
theenginewasdesigned.
REQUIREMENTS
- Do not disconnect the battery supply while the engine is running.
- Do not perform arc welding near the engine without first removing its electrical wiring.
- After all maintenance operations that require disconnecting the batteries, make sure that the terminals have been well secu-
red on the poles.
- Do not use a battery charger to start the engine.
- Disconnect the battery/batteries from the on-board system while recharging.
- Do not paint the devices, components and electrical connectors of the engine equipment.
- Electrically disconnect the battery/batteries before performing any electrical work.
- Contact the Manufacturer before installing any electronic equipment.
Do not perform any operation that would change the calibration of the injection pump.
It was adjusted during the engine test phase and based on its destination.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the FPT CURSOR Series and is the answer not in the manual?

FPT CURSOR Series Specifications

General IconGeneral
Engine TypeDiesel
ConfigurationInline
AspirationTurbocharged
Fuel SystemCommon Rail
Cooling SystemLiquid Cooled