EasyManua.ls Logo

FPT CURSOR Series - Page 147

FPT CURSOR Series
274 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 5 - REMOVAL - REFITTING OF THE MAIN ENGINE COMPONENTS
63
CURSOR SERIES
Print P4D32C006 E Base - 03/2015
Figure 187
225025
Fit the turbocharger (2) together with the new gasket onto the
exhaust manifold and tighten the nuts (1) to the torque
indicated in the table.
Ref.
No. Description
Tightening
torques
(1) 4 Nuts M12 X 1.75 75 Nm
Figure 188
225062
Tighten the screws securing the turbocharger following the
sequence indicated in the figure.
Figure 189
227761
Mount the oil delivery pipe to turbocharger (3) and tighten
screws of the bracket (1) and the fitting (2) to the torque
showninthetable.
Fit the engine oil return pipe from the turbocharger (5) with
the new gaskets and tighten the screws (4, 6) to the torque
indicated in the table.
Ref.
No. Description
Tightening
torques
(1) 1 M10 screw 24.5 ± 2.5 Nm
(2) 1
Fitting
M16 X 1.5 X 12
42.5 ± 2.5Nm
(4, 6) 4 M8 x 1.25 screws 24.5 ± 2.5 Nm
Figure 190
227760
Connect the sleeve (3) of the combustion air intake pipe to the
turbocharger and tighten the clamps.
Tighten the screws (2) of the oil delivery pipe to the
turbocharger to the torqueindicatedinthetable.
Ref.
No. Description
Tightening
torques
(1) 2 M8 x 1.25 screws 24.5 ± 2.5 Nm
Connect the air intake pipe (1) to the aftercooler and tighten
clamp and collar.
Make al the electrical connections and secure the engine cable
with clamps to the clips.
Refit the air filter as described in the procedure AIR FILTER
REMOVAL - REFITTING”.

Table of Contents

Related product manuals