EasyManua.ls Logo

Fujitsu PRIMERGY RX2520 M1 - Concluding Steps; Removing 3.5-Inch HDD Modules; Preliminary Steps

Fujitsu PRIMERGY RX2520 M1
432 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
138 Upgrade and Maintenance Manual
RX2520 M1
Hard disk drives / solid state drives
Ê Insert the HDD module into a drive bay and carefully push back as far as it
will go (1).
Ê Fold back the lever to lock the HDD module in place (2).
7.3.2.4 Concluding steps
Ê "Performing a RAID array rebuild" on page 94
7.3.3 Removing 3.5-inch HDD modules
7.3.3.1 Preliminary steps
Ê If the HDD module to be removed is combined into a RAID array, please
proceed as follows:
Customer Replaceable Unit
(CRU)
Hardware: 5 minutes
Tools: tool-less
RAID level Procedure
RAID 0
Only remove an HDD module combined in a RAID 0
array if defective.
V CAUTION!
Removing an operational HDD module will
result in data loss!
RAID 1
RAID 5
Removing an HDD module from a RAID 1 or RAID 5
array will not result in data loss.
However, the removed drive needs to be replaced
immediately by an HDD module of the same or larger
capacity.
I After replacing the HDD module, RAID rebuild
will be performed as a background process as
described in section "Performing a RAID array
rebuild" on page 94.

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2520 M1

Related product manuals