EasyManua.ls Logo

Fujitsu PRIMERGY RX2520 M1 - Concluding Steps; Software Configuration

Fujitsu PRIMERGY RX2520 M1
432 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RX2520 M1
Upgrade and Maintenance Manual 339
System board and components
Figure 231: Installing the UFM
Ê Connect the UFM to the system board, snapping in the UFM spacer.
14.3.1.3 Concluding steps
Ê "Reassembling" on page 59
Ê "Connecting the server to the power source" on page 64
Ê "Switching on the server" on page 66
Ê "Enabling SVOM boot watchdog functionality" on page 87
Ê "Enabling BitLocker functionality" on page 93
14.3.1.4 Software configuration
The UFM delivery set includes the "Recovery Tool CD" to setup the ESXi
configuration. Proceed as follows:
Ê Switch on the server.
Ê Right after switching on the server, insert the "Recovery Tool CD" into the
DVD drive and close the drive tray.

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2520 M1

Related product manuals