EasyManua.ls Logo

Fujitsu PRIMERGY RX2520 M1 - Concluding Steps

Fujitsu PRIMERGY RX2520 M1
432 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RX2520 M1
Upgrade and Maintenance Manual 237
Processors
Figure 127: Closing the socket release lever
Ê Close the socket release lever (1) and latch it under the load plate retention
tab (2) to lock down the load plate.
Ê If applicable, install the second processor accordingly.
11.2.3 Concluding steps
Ê "Installing processor heat sinks" on page 245
Ê "Reassembling" on page 59
Ê "Connecting the server to the power source" on page 64
Ê "Updating or recovering the system board BIOS and iRMC" on page 75
Ê "Switching on the server" on page 66
Ê "Enabling SVOM boot watchdog functionality" on page 87
Ê "Enabling BitLocker functionality" on page 93

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2520 M1

Related product manuals