EasyManua.ls Logo

Fujitsu PRIMERGY RX2520 M1 - Concluding Steps; Upgrading or Replacing Processors

Fujitsu PRIMERGY RX2520 M1
432 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
242 Upgrade and Maintenance Manual
RX2520 M1
Processors
Figure 133: Close the socket release lever
Ê Close the socket release (1) lever and latch it under the load plate retention
tab to lock down the load plate (2).
11.3.3 Concluding steps
Ê "Reassembling" on page 59
Ê "Connecting the server to the power source" on page 64
Ê If applicable, "Updating or recovering the system board BIOS and iRMC" on
page 75
Ê "Switching on the server" on page 66
Ê "Enabling SVOM boot watchdog functionality" on page 87
Ê "Enabling BitLocker functionality" on page 93
11.4 Upgrading or replacing processors
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Software: 5 minutes
Tool: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2520 M1

Related product manuals