Figure 133: Close the socket release lever
Ê Close the socket release (1) lever and latch it under the load plate retention
tab to lock down the load plate (2).
11.3.3 Concluding steps
Ê "Reassembling" on page 59
Ê "Connecting the server to the power source" on page 64
Ê If applicable, "Updating or recovering the system board BIOS and iRMC" on
page 75
Ê "Switching on the server" on page 66
Ê "Enabling SVOM boot watchdog functionality" on page 87
Ê "Enabling BitLocker functionality" on page 93
11.4 Upgrading or replacing processors
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Software: 5 minutes
Tool: Phillips PH2 / (+) No. 2 screw driver