EasyManua.ls Logo

SKF Microlog GX Series - Nose Run-Out test overview

SKF Microlog GX Series
342 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Spindle Test Module
Spindle Tests Overview
Nose Run-Out test overview
Figure 1013.
Perform a Nose Run-Out Test.
To perform a nose run-out test:
Clean all tool nose surfaces, inside and outside.
If scratches exist on tool nose surfaces, polish with a lapping film 30µ, 12µ alt 5µ,
to erase high peaks. Afterwards clean with liquid.
Power the Microlog on and select the Spindle module’s Nose Run-Out test.
In Nose Run-Out test setup screens, enter the tool holder type and select the
appropriate conformance setup.
Figure 1014.
Nose Run-Out Test Setup Screens.
SKF Microlog - GX Series 10 - 11
User Manual

Table of Contents

Related product manuals