Controller
9836 3123 01 117 (428)
9 Job
The Job function is advantageous when an object has bolts or screws that require different
torque and angle values for tightening. A Job is useful when an object needs different
Psets and Multistages. Instead of manually selecting each Pset or Multistage, the Job
functionality keeps Psets and Multistages in a predefined order.
Power Focus allows 50 Psets/Multistages in a Job, and the storage of 99 Jobs (with the
memory setup it is possible to store up to 400 Jobs, see section Memory).
The Job function is RBU-dependent.
A Job is normally pre-programmed (static). A static job is created and stored in the Power Focus or
from ToolsTalk PF. A dynamic job is created externally and sent to PF via Open Protocol for
immediate execution. The lifetime of a dynamic Job is the time for the Job to be executed.
For more information on Open Protocol, see section MID 140 Execute dynamic Job request in the
Power Focus Open Protocol User Guide.
This section includes screenshots from ToolsTalk PF. The screenshots show examples of
parameter settings and are NOT intended to be generally applicable. Check with your
local Atlas Copco representative how to set up your specific system environment.
See parameter list section Job for a description of all available Job options.
9.1 Job concepts
The Job function in Power Focus can be defined by two categories, Standalone Job and Cell Job.
Standalone Job is when just one PF is involved in the Job, and Cell Job is a Job in which several PF units
are involved. The Psets/Multistage included in a Job can be selected from a stand-alone PF or from several
PF units in a Cell.
All PF units that perform a Cell Job must belong to the same Job group. A Job group consists of a
maximum of 20 controllers within the same Cell (see section Controller for more information).
A single PF can only belong to one Job group, but it is possible to create several Job groups in the same
Cell.
In a Job group, all included controllers are Job members. One of the Job members acts as a Job reference,
the others act as Job clients (see figure on next page). The Job reference retains a list of all Psets and
Multistages available for all Job members. The Job reference is the main controller and remote controls
the Job clients.

Table of Contents

Other manuals for Atlas Copco Power Focus 3000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas Copco Power Focus 3000 and is the answer not in the manual?

Atlas Copco Power Focus 3000 Specifications

General IconGeneral
BrandAtlas Copco
ModelPower Focus 3000
CategoryControl Systems
LanguageEnglish

Related product manuals