SV-XPNDR-261 Transponder Installation and Configuration
SkyView HDX System Installation Manual - Revision E 12-27
The figure below is the screen that appears after the Software update is complete. Once
the Software update is complete, the SV-XPNDR-261 requires a power cycle to restart
with the newer Software. Simply power down the SV-XPNDR-261, using the transponder
switch, circuit breaker, etc. Or simply power off the MASTER or AVIONICS switch. A
power-off of only a few seconds is required.
Figure 84: SV-XPNDR-261 Software Update Complete