EasyManua.ls Logo

Leibinger JET3 up - Page 57

Leibinger JET3 up
412 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Group 5 Transport/Start up Page 55
JET3up Release R1.06
Turn on the printer. For this touch the dark touch-display (1) at any position for
approx. 2 sec.
The device turns on and the main window with the message<Initialization> (2)
is displayed. Wait until the initialization is finished. After this process the
message<Emergency Shutdown> (3) is displayed.
Press the button <OK> (4).
Change to tab <Special functions /Tools> (5).
Now press the button <Fill up Routine> (6). The message <Fill up Routine>
(7) is faded-in.
Press the button <Next> (8) to start the filling routine.
Note:
This process takes approx. 10 minutes.
After finishing the process an according message (9)
is displayed. Press the
button <OK> (10) to finish the routine.
Press the button <Close> (11) to leave the menu <Special functions /Tools>.
The message <Hydraulic control> (12) is faded-in.
Note:
For leaving the service menu the hydraulic control will be turned on again
automatically.
Press the button <OK> (13) to close the service menu.
The main window (14)
is now displayed. If required the device starts
automatically with the bleeding of the system.
During the process the message <Bleeding> (4) is displayed. The bleeding
takes between 1 5 min. The process can be canceled by pressing the button
<Cancel> (5).
Now the printer is ready to operate.

Table of Contents

Other manuals for Leibinger JET3 up

Related product manuals