EasyManua.ls Logo

D-Link DGS-3000 - Page 640

D-Link DGS-3000
909 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DGS-3000 Series Layer 2 Managed Gigabit Ethernet Switch CLI Reference Guide
636
start - If start is specified, it will request the peer to change to the remote loopback mode.
stop - If stop is specified, it will request the peer to change to the normal operation mode.
received_remote_loopback - Specify receive remote loop-back.
process - Specify to process the received Ethernet OAM remote loopback command.
ignore - Specify to ignore the received Ethernet OAM remote loopback command. The default
method is”ignore”.
Restrictions
Only Administrators and Operators can issue this command.
Example
To configure Ethernet OAM on ports 1 to 2 in active mode:
DGS-3000-26TC:admin#config ethernet_oam ports 1-2 mode active
Command: config ethernet_oam ports 1-2 mode active
Success.
DGS-3000-26TC:admin#
To enable Ethernet OAM on port 1:
DGS-3000-26TC:admin#config ethernet_oam ports 1 state enable
Command: config ethernet_oam ports 1 state enable
Success.
DGS-3000-26TC:admin#
To configure the error symbol threshold to 2 and period to 1000ms for port 1:
DGS-3000-26TC:admin#config ethernet_oam ports 1 link_monitor error_symbol
threshold 2 window 1000 notify_state enable
Command: config ethernet_oam ports 1 link_monitor error_symbol threshold 2
window 1000 notify_state enable
Success.
DGS-3000-26TC:admin#
To configure the error frame threshold to 2 and period to 1000 ms for port 1:

Table of Contents

Related product manuals