EasyManua.ls Logo

Dynon Avionics SkyView Classic - Initial SV-BAT-320 Test

Default Icon
573 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SV-BAT-320 Backup Battery Installation
9-6 SkyView System Installation Guide - Revision AA
DATE OF LAST TEST: UNTESTED / MM-DD-YYYY
o If this date is over a year ago, SkyView will annunciate BATTERY TEST NEEDED upon
startup. Follow the steps in Initial SV-BAT-320 Test below.
TEST RESULT:
o FAIL: VOLTAGE DROP TOO HIGH: Battery likely needs to be replaced. Contact Dynon
Avionics Technical Support (contact information at the beginning of this manual).
o FAIL: LASTED xx MINS: Battery likely needs to be replaced. Contact Dynon Avionics
Technical Support (contact information at the beginning of this manual).
o PASS BATT LIFE > 45 MIN: The last full test of battery passed
BATTERY STATUS: (voltage)
CHARGE STATUS: CHARGING/DISCHARGED/CHARGED/STANDBY/NO BATTERY
An SV-BAT-320 is fully charged when it reaches 12.25 volts. Charging a completely
discharged battery may take up to 4 hours. To conserve your aircraft battery, the
SV-BAT-320 only charges when SkyView detects that your alternator or generator
is running (whenever your engine is running), which is when SkyView’s input
voltage is above 12.25V. Alternatively, connecting a battery charger to your
aircraft battery will also raise the input voltage to a level that will allow SkyView’s
SV-BAT-320 to charge.
The SV-BAT-320 must only be charged by SkyView. External charging of the battery
is not supported. External charging of the battery can damage it or cause it to
explode.
Initial SV-BAT-320 Test
Figure 101 – BATTERY TEST NEEDED Message
The Initial SV-BAT-320 Test is performed to ensure that a SV-BAT-320 is fully functional after
installation is complete. SkyView records the date of the last battery test (if any) and will
annunciate, via a message and an icon in the top bar, when an initial, or annual battery test is
required. For instructions on performing the annual SV-BAT-320 test, see Appendix A:
Maintenance and Troubleshooting, Instructions for Continued Airworthiness, Annual SV-BAT-
320 Test.
An SV-BAT-320 is designed to (when fully charged) power a SkyView display and devices
powered by a SkyView display (see System Planning, Power for details), for at least 60 minutes
if aircraft power is lost. The Initial SV-BAT-320 Test ensures that an SV-BAT-320 has adequate
capacity by discharging it while recording the time elapsed.

Table of Contents