Conceptual Walk Through of Provisioning
Assume that the NEs at Site A and Site B already connect to the DCN through LCN1 and all OSC links are up and
running. The objecve is to use the OSC links to propagate DCN connecvity to the other NEs in the network.
The following gure shows provisioning for two representave NEs (Site B and Site C) with the understanding
that similar provisioning is required at other NEs (to propagate DCN connecvity throughout the network).
Remote Users
Virtuora User
Interface
WebGUI
CLI
NETCONF/
YANG
Router
Switch
LAN cable
Virtuora NC
LAN
LAN
DCN
Router
Switch
LAN cable
1FINITY
ILA
1FINITY
ROADM
1FINITY
ROADM
OSC
1FINITY
ROADM
1FINITY
ILA
1FINITY
ROADM
OSC
Site A
Site B
1FINITY
ROADM
LCN1
1FINITY
ROADM
LCN1
OSC
OSC
Site C
Figure 92
Provisioning Two Representave NEs
The following gure shows the inial conguraon of NEs at Site B and Site C.
Initial System Turn Up
Congure IP Connection to DCN