EasyManua.ls Logo

Fujitsu 1FINITY L100 - Limitations on Load Configuration

Fujitsu 1FINITY L100
473 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A.3
Limitations on Load Conguration
In this secon:
A.3.1 Fabric and Port-Connecon
A.3.2 SNMPv3
A.3.3 Fujitsu Opcal Interfaces
A.3.4 RollBack
A.3.5 Load Conguraon with Large Database
A.3.6 LLDP
A.3.1
Fabric and Port-Connection
Dierent Conguraon File from Running Database
If the running conguraon consists of fabric and port connecons and the conguraon is dierent from the
conguraon le, the user needs to delete all fabric- and port-connecon enes from the database rst and
execute the load replace operaon.
Fabric X
Config File:
Running Config:
Shelf 1 Shelf 2
Port-Connection A
Fabric Y
Shelf 3 Shelf 4
Port-Connection B
Fabric X
Shelf 1 Shelf 2
Port-Connection A
FNC001285_Rev_01
Figure 187
Restoring Conguraon
In the preceding gure, the user restores the conguraon le onto the system. The user needs to delete fabric
X, fabric Y, port-connecon A, and port-connecon B before execung the load replace operaon.
Load
Conguration Operation
Limitations on Load Conguration
454
Release 19.1.1 · Issue 1.1, May 2021
Fujitsu and Fujitsu Customer Use Only

Table of Contents

Related product manuals