EasyManua.ls Logo

Fujitsu 1FINITY L100 - Install 19-Inch, 2-Post Rack Rail Kit

Fujitsu 1FINITY L100
473 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.5
Install 19-Inch, 2-Post Rack Rail Kit
Prerequisites:
The 19-inch, 2-post EIA-310 compliant rack is installed according to local standards.
Hex-nut driver set and socket wrench set
Screwdriver set (including straight-slot and Phillips
®
head)
Small level
Step 1
Determine the le and right bracket for installaon.
Note: Each bracket is labeled le or right as shown in the following gure.
s8101bg_1
Figure 31
Le and Right Bracket Labels
Step 2
Loosen the ange nuts on both the le and right brackets, as shown in the following gure.
Note: Do not completely remove the nuts from the ange.
Equipment Installation
Install 19-Inch, 2-Post Rack Rail Kit
107
Release 19.1.1 · Issue 1.1, May 2021
Fujitsu and Fujitsu Customer Use Only

Table of Contents

Related product manuals