EasyManuals Logo

Fujitsu 1FINITY L100 User Manual

Fujitsu 1FINITY L100
473 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #108 background imageLoading...
Page #108 background image
Left Bracket
Right Bracket
Front Flange
Rear Flange
Nuts
s8102bl_1
Figure 32
Loosening Flange Nuts 19-Inch, 2-Post Rack Bracket
Step 3
Adjust the width between the front ange and rear ange (on both brackets) to the width of the rack.
Step 4
Use the front ange on each bracket to aach the brackets to the front of the rack at the required posion, as
shown in the following gure.
Note: Do not completely ghten the bolts, the bolts are completely ghtened later in the procedure.
Equipment Installation
Install 19-Inch, 2-Post Rack Rail Kit
108
Release 19.1.1 · Issue 1.1, May 2021
Fujitsu and Fujitsu Customer Use Only

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu 1FINITY L100 and is the answer not in the manual?

Fujitsu 1FINITY L100 Specifications

General IconGeneral
BrandFujitsu
Model1FINITY L100
CategoryServer
LanguageEnglish

Related product manuals