EasyManuals Logo

Fujitsu PRIMERGY CX2550 M4 Upgrade And Maintenance Manual

Fujitsu PRIMERGY CX2550 M4
454 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #119 background imageLoading...
Page #119 background image
CX2550/60/70 M4 Upgrade and Maintenance Manual 119
Expansion cards and OCP mezzanine cards
6.2.1 Installing expansion cards
6.2.1.1 Preliminary steps
Perform the following procedures:
Ê "Disabling the boot watchdog functionality of ServerView Operations
Manager" on page 73
Ê Locate the desired server node with the ID button.
Ê "Shutting down the server node" on page 50
Ê Remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 51
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M4

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY CX2550 M4 and is the answer not in the manual?

Fujitsu PRIMERGY CX2550 M4 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY CX2550 M4
CategoryServer
LanguageEnglish

Related product manuals