EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M4

Fujitsu PRIMERGY CX2550 M4
454 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
128 Upgrade and Maintenance Manual CX2550/60/70 M4
Expansion cards and OCP mezzanine cards
6.3.1 Installing expansion cards
6.3.1.1 Preliminary steps
Perform the following procedures:
Ê "Disabling the boot watchdog functionality of ServerView Operations
Manager" on page 73
Ê Locate the desired server node with the ID button.
Ê "Shutting down the server node" on page 50
Ê Remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 51
Ê "Removing the GPGPU / SXM2 extension tray" on page 53
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M4

Related product manuals