CX2550/60/70 M4 Upgrade and Maintenance Manual 197
7.4 Replacing memory modules
7.4.1 Preliminary steps
Perform the following procedures:
Ê "Disabling the boot watchdog functionality of ServerView Operations
Manager" on page 73
Ê Locate the desired server node with the ID button.
Ê "Shutting down the server node" on page 50
Ê If applicable, remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 51
Ê "Removing the memory slot air duct (Air cooling only)" on page 63
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: tool-less