EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M4

Fujitsu PRIMERGY CX2550 M4
454 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
190 Upgrade and Maintenance Manual CX2550/60/70 M4
Main memory
7.2 Installing memory modules
I If liquid cooling kit is installed, first prepare the memory modules, see
section "Memory module cooling pads for Liquid Cooling (LC)" on
page 198.
7.2.1 Preliminary steps
Perform the following procedures:
Ê "Disabling the boot watchdog functionality of ServerView Operations
Manager" on page 73
Ê Locate the desired server node with the ID button.
Ê "Shutting down the server node" on page 50
Ê If applicable, remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 51
Ê "Removing the memory slot air duct (Air cooling only)" on page 63
Ê Identify the correct memory slot according to the mounting order, see section
"Memory sequence" on page 185.
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: tool-less

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M4

Related product manuals