EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M4

Fujitsu PRIMERGY CX2550 M4
454 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
156 Upgrade and Maintenance Manual CX2550/60/70 M4
Expansion cards and OCP mezzanine cards
6.5 Riser card
V CAUTION!
Follow the safety instructions in chapter "Important information" on
page 33.
6.5.1 Replacing the riser card
6.5.1.1 Preliminary steps
Perform the following procedures:
Ê Locate the desired server node with the ID button.
Ê "Disabling the boot watchdog functionality of ServerView Operations
Manager" on page 73
Ê "Shutting down the server node" on page 50
Ê If applicable, remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 51
Ê "Removing the riser module" on page 58
Ê "Removing expansion cards" on page 122 (if applicable)
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: Hexagonal socket SW6

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M4

Related product manuals