EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M4

Fujitsu PRIMERGY CX2550 M4
454 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50 Upgrade and Maintenance Manual CX2550/60/70 M4
Basic hardware procedures
4.2 Shutting down the server node
V CAUTION!
For further safety information, see chapter "Important information" on
page 33.
I This step is only required when upgrading or replacing non-hot-plug
components.
Ê Inform the system administrator that the server node will be shut down and
put offline.
Ê Terminate all applications.
Ê Press the On/Off button either on the server node or on the corresponding
front panel to shut down the server node.
I For more information, see section "Controls and indicators on the
server node" on page 448.
I If the system is running an ACPI-compliant operating system,
pressing the On/Off button will perform a graceful shutdown.

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M4

Related product manuals