290 Upgrade and Maintenance Manual CX2550/60/70 M4
System board and components
9.3.3.1 Preliminary steps
Ê "Disabling the boot watchdog functionality of ServerView Operations
Manager" on page 73
Ê "Suspending BitLocker functionality" on page 71
Ê Locate the desired server with the ID button.
Ê "Shutting down the server node" on page 50
Ê If applicable, remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 51
9.3.3.2 Removing the defective TPM
Ê Remove the TPM, see section "Removing the TPM" on page 285.
Ê Leave the TPM spacer on the system board when removing the defective
TPM.
9.3.3.3 Installing the new TPM
I The TPM spacer is already present on the system board.
Ê Install the TPM, see section "Installing the TPM" on page 282.
9.3.3.4 Concluding steps
Ê "Installing the system board" on page 311
Ê "Completing the system board" on page 317
Ê "Installing the server node in the server enclosure" on page 67
Ê If applicable, reconnect all external cables.
Ê "Resuming BitLocker functionality" on page 96
Ê "Enabling SVOM boot watchdog functionality" on page 88