EasyManuals Logo

Fujitsu PRIMERGY CX2550 M4 Upgrade And Maintenance Manual

Fujitsu PRIMERGY CX2550 M4
454 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #194 background imageLoading...
Page #194 background image
194 Upgrade and Maintenance Manual CX2550/60/70 M4
Main memory
7.3 Removing memory modules
7.3.1 Preliminary steps
Perform the following procedures:
Ê "Disabling the boot watchdog functionality of ServerView Operations
Manager" on page 73
Ê Locate the desired server node with the ID button.
Ê "Shutting down the server node" on page 50
Ê If applicable, remove all external cables from the server node.
Ê "Removing the server node from the server enclosure" on page 51
Ê "Removing the memory slot air duct (Air cooling only)" on page 63
Ê Identify the desired memory slot according to the mounting order, see
section "Memory sequence" on page 185.
V CAUTION!
Ensure to maintain an operational configuration when removing
memory modules. For additional information, see section "Operation
modes" on page 187.
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: tool-less

Table of Contents

Other manuals for Fujitsu PRIMERGY CX2550 M4

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY CX2550 M4 and is the answer not in the manual?

Fujitsu PRIMERGY CX2550 M4 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY CX2550 M4
CategoryServer
LanguageEnglish

Related product manuals