4. Press «Enter» to accept the setting.
8 9 p s i 0 8 : 1 5 1 7 6 ° F
5.2.3 Load control
Menu
pA/pB Cycle
pA : 10 h – 10 h pB : 18 h – 18 h
Active line, manually set setpoint value – automati‐
cally elapsing value (example)
1.Start pA ¦ 00:00
·········
5. Set the timer period for pB in the same manner.
6. Press «Enter» to accept the setting.
Result The timer period for the system setpoint pressure pA and pB is set.
7.8.3.2 Setting starting time for pA or pB
1. Press the «DOWN» key.
2. Press the «Right» key.
3. Press «Enter» to switch into setting mode.
The starting time
h
flashes.
8 9 p s i 0 8 : 1 5 1 7 6 ° F
5.2.3 Load control
Menu
pA/pB Cycle
pA : 10 h – 10 h pB : 18 h – 18 h
1.Start pA ¦ 06:30
Active line, starting time
·········
4. Press «UP» to set the hours.
5. Press the «Right» key.
The starting time
min
flashes.
6. Press «UP» to set the minutes.
7. Press «Enter» to accept the settings.
Result The starting time for pA is set.
The period is to start with pB.
➤ Press «Enter» and specify the first start pB with «UP».
7.8.3.3 Selecting local mode
Precondition Password level 2 is activated.
The
< Configuration ➙ Pressure control ➙ Load control >
menu is selected.
The clock program or timer is set up.
7 Initial Start-up
7.8 Configuring the machine for local mode
86
Service manual Controller
SIGMA CONTROL 2 SCREW FLUID 1.1.3 9_9450 03USE