When working on the drive system
Touching voltage carrying components can result in electric shocks, burns or death.
Touching the fan wheel, the coupling or the belt drive while the machine is switched on can result
in serious injury.
Switch off and lock out the power supply isolating device and verify the absence of voltage.
Do not open the cabinet while the machine is switched on.
Further information Details of authorized personnel are found in chapter 3.4.2.
Details of dangers and their avoidance are found in chapter 3.5.
7.2 Instructions to be observed before commissioning or re-commis‐
sioning
Incorrect or improper commissioning can cause injury to persons and damage to the machine.
Commissioning may only be carried out by authorised installation and service personnel who
have been trained on this machine.
Special measures for re-commissioning after storage
Storage period
longer than:
Remedy
3 months Manually fill the airend with cooling oil.
12 months Change the oil filter.
Change the oil separator cartridge.
Change the cooling oil.
Have the motor bearings checked by an authorised KAESER Service Techni‐
cian.
Have the frequency converter smoothing capacitors formed by an authorised
KAESER Service Technician.
36 months Have the overall technical condition checked by an authorised KAESER Serv‐
ice Technician.
Tab. 31 Re-commissioning after storage
7.3 Checking installation and operating conditions
Check and confirm all the items in the checklist before initially starting the machine.
To be checked See
chapter
Complied?
Are the operators fully conversant with safety regulations?
Have all the positioning conditions been fulfilled? 5
Is a user's lockable power supply disconnecting device installed? 6.5
Does the power supply conform to the specifications on the name‐
plate?
2.1
7 Initial Start-up
7.2 Instructions to be observed before commissioning or re-commissioning
ESD_2C_10357405_10–LIN_00 E
Service Manual Screw Compressor
ESD 442/14 bar (abs) SFC SIGMA CONTROL 2