1. Check and confirm all the items in the checklist before starting the machine.
When power is applied to the machine the controller boots and carries out a self test.
The display and the
Controller on
LED illuminate.
The actual system pressure (pNloc), the time and the airend discharge temperature are dis‐
played in the first line of the display.
8 9 p s i 0 8 : 1 5 1 2 2 ° F
·········
Alarm
·········
Key - off ¦ pA - off
·········
Run 0 h Load 0 h
Maintenance in 2000 h
2. Continue the commissioning process as described in chapter "Commissioning" of the ma‐
chine's operating manual.
7 Initial Start-up
7.14 Commissioning the machine
9_9450 03USE
Service manual Controller
SIGMA CONTROL 2 SCREW FLUID 1.1.3
139