4 Test Run
4 - 2
High-function General-purpose Inverter RX2 Series User’s Manual
4-1 Test Run Method
To perform a test run, follow the procedures shown below.
Carefully read and understand Safety Precautions on page 8 and the relevant instructions in the follow-
ing chart before starting works.
Operation with the host device can be checked before connecting a load and motor.
Procedure
Procedure ► Check Items ► For more details,
1. Safety check
See the precautions required for han-
dling the inverter.
See Safety Precautions on page 8.
2. Checking the
inverter
Confirm that there is no abnormality in
items included in the package of inverter
and the appearance of the inverter.
See Checking the Accessories on page 19.
3. Installation of the
inverter
Confirm that the inverter is installed in a
proper environment and in a proper set-
ting.
See 1-3-4 External Dimensions on page
1-13.
4. Wiring requirements
Confirm that wires are properly con-
nected to the inverter.
See 2-3 Wiring on page 2-20.
5. Setting up the oper-
ation method
Check how to operate the LCD operator. See Section 3 Operation.
6. Setting up the run-
ning method
Set up the inverter running method.
See 6-3 Operation Command Settings on
page 6-19.
7. Selecting a control
mode and protec-
tive function accord-
ing to a load
Set up the inverter control method.
See 7-1 Overview of Motor Control Meth-
ods on page 7-3 for descriptions of required
items.
The items required for running the inverter
are provided in the following article.
Completed