System Functions 65
1
Set The Number Of Days Until The First Test Report
If you require the first test to report (Contact ID Event Code 602) the day after you are installing the
control panel and you have programmed the repeat interval between each test report for every 7 days,
you will need to set when the first test report will occur. If the first test report is not set using this
Installer Code Function, the first test report will be sent to the base station receiver in the number of
days programmed in the repeat interval. Refer to "LOCATION 372 - 378" on page 197 for setting the
test report time and repeat interval.
How To Set The First Test Report
1. Enter your followed by 1and the button.
Three beeps will be heard and the
STAY and AWAY indicators will begin to flash.
2. Enter the
to wait (1 - 15 days) until the first test report is required.
3. Press the
button when finished.
Two beeps will be heard and the
STAY and AWAY indicators will extinguish. The system will
now return to the disarmed state.
+
1
+
+
+
Each time you enter Installer's Programming Mode after you have set when the first test report
will occur, the first test report time will default back to the repeat interval time between each
test report as set in “LOCATION 378”.
Test reports will not report if the Subscriber ID Number is 0000. The number of day’s
decrements by one at 00:00 hours as set in "LOCATION 901 – 904" on page 222.
Example
If you programmed the repeat interval in the test reports for every seven days, but wish to have the
first test report to begin in two days time, follow the sequence outlined below;
1234
+
1
+
+
2
+