Fiber Restraint
Gate
Open
Closed
PIU Slots
Set Screw
FNC000054_Rev_01
Figure 134
Unlatching Fiber Restraint Gate
Step 30
Aer opening the ber restraint gates, secure the blade to the rack using the set screws on the le- and right-
hand sides of the blade.
Note: The set screws for securing the blade are accessible aer opening the ber restraint gates on the le-
and right-hand sides of the blade.
Step 31
Replace the ber-opc and RJ-45 cables that are previously removed.
Step 32
Verify that power is turned o at the source and install the power cables.
Step 33
Is the blade being installed a Main blade?
If YES:
Connue with next step.
If NO:
Proceed to Step 39.
System Maintenance
Equipment Replacement
384
Release 19.1.1 · Issue 1.1, May 2021
Fujitsu and Fujitsu Customer Use Only