4 Equipment Installaon p. 101
4.1 Precauons p. 102
4.2 Site Selecon p. 103
4.3 Unpack and Inspect Equipment p. 104
4.4 Adjustable Range of Rack Brackets p. 106
4.5 Install 19-Inch, 2-Post Rack Rail Kit p. 107
4.6 Install 23-Inch, 2-Post Rack Rail Kit p. 113
4.7 Install 19-Inch, 4-Post Rack Rail Kit p. 119
4.8 Install 23-Inch, 4-Post Rack Rail Kit p. 125
4.9 Install Power Terminal Adapter p. 131
4.10 Install Blade in Housing p. 136
4.11 Recer and Blade Wiring Connecons p. 139
4.12 Install Power Cables p. 141
4.13 Install Fan Unit p. 146
4.14 Install Plug-In Unit p. 148
4.15 Install SFP Module p. 151
4.16 Install Filler Panel p. 152
4.17 Install Data Communicaon Network Cabling p. 154
4.18 Install Local Management Port Cabling p. 155
4.19 Install CD ROADM Cabling p. 156
4.20 Install L160 Raman Cabling p. 157
5 Inial System Turn Up p. 159
5.1 Log On p. 160
5.2 Set Up Main Blade (Inial) p. 162
5.3 Set WDM Conguraon p. 164
5.4 CONSOLE Port (Serial Port) p. 165
5.4.1 Enable/Disable CONSOLE Logon p. 165
5.4.2 CONSOLE Log On p. 166
5.5 Congure OSPF Roung p. 168
5.6 Congure IP Connecon to DCN p. 169
5.6.1 Congure LCN1 with Stac IP Address p. 170
Set Stac IP Address on LCN1 p. 171
Congure Next-Hop p. 171
Connect LCN1 to DCN p. 172
5.6.2 Congure LCN1 with DHCP p. 173
Congure Next-Hop p. 174
Connect LCN1 to DCN p. 175
Idenfy IP Address Assigned to LCN1 by DHCP p. 175
5.6.3 Congure IP Connecon Through OSC p. 176
Congure NEM Interface p. 180
Congure IP Interfaces for OSC Links p. 180
Congure OSPF Roung p. 182
4
Release 19.1.1 · Issue 1.1, May 2021
Fujitsu and Fujitsu Customer Use Only