EasyManua.ls Logo

MacDon D1 Series - Page 238

MacDon D1 Series
546 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
215184 214 Revision A
1029541
A
B
Figure 7.21: Top Beam Resting on Feeder House
3. Raise feeder house until transition frame top beam (A) is
fully resting on the feeder house. Raise the header slightly
off the ground.
IMPORTANT:
The full weight of the header must be on the feeder house,
NOT on pins (B).
1029542
A
B
C
Figure 7.22: Feeder House Locking Pins
4. Position bottom of feeder house so that locking pins (A)
align with the holes in mount (C).
5. Push lever (B) down to extend locking pins (A) so they
engage in mount (C).
1029544
A
B
Figure 7.23: Driveline in Storage Position
6. Rotate lock disc (A) upward and remove driveline (B) from
the support.
ATTACHING HEADER TO COMBINE

Table of Contents

Related product manuals