EasyManua.ls Logo

R&S SMA100B - Page 269

R&S SMA100B
822 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Improving level performance
R&S
®
SMA100B
269User Manual 1178.3834.02 ─ 09
Duty Cycle ← Notifications - Pulse Data Analysis
Indicates the ratio between the pulse duration (τ) and the pulse period (T) of the mea-
sured pulse signal in per cent:
Duty Cycle = (pulse duration / pulse period) * 100
Remote command:
:TRACe<ch>[:POWer]:SWEep:MEASurement:PULSe:DCYCle? on page 540
:TRACe<ch>[:POWer]:SWEep:MEASurement:PULSe:DCYCle:DISPlay:
ANNotation[:STATe] on page 541
Pulse Width ← Notifications - Pulse Data Analysis
Indicates the pulse duration of the pulse data measurement in seconds.
Remote command:
:TRACe<ch>[:POWer]:SWEep:MEASurement:PULSe:DURation? on page 540
:TRACe<ch>[:POWer]:SWEep:MEASurement:PULSe:DURation:DISPlay:
ANNotation[:STATe] on page 541
Pulse Period ← Notifications - Pulse Data Analysis
Indicates the time the pulse signal needs to complete one cycle.
Remote command:
:TRACe<ch>[:POWer]:SWEep:MEASurement:PULSe:PERiod? on page 540
:TRACe<ch>[:POWer]:SWEep:MEASurement:PULSe:PERiod:DISPlay:
ANNotation[:STATe] on page 541
Pulse Off Time ← Notifications - Pulse Data Analysis
Determines the time the pulse signal is low, that means as long as the signal level is
below the proximal value.
Using power sensors

Table of Contents

Other manuals for R&S SMA100B

Related product manuals