EasyManua.ls Logo

GE Discovery LS - Disconnect and Discard the CT-PET Positions Cable (P;N 2318721); Figure 6-19: ETC Board Locations

GE Discovery LS
358 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 2307224-100, REVISION 6DISCOVERY LS SYSTEM SERVICE MANUAL
Page 126 Chapter 6 - Table
6.2.5.7 Disconnect and Discard the CT-PET Positions Cable (P/N 2318721)
The ETC I/F J8 connection consists of three cables and a pigtail. Two cables go to the PET and CT
limit switches, and one cable goes to the Gantry. The pigtail connects all the signals to the ETC I/F
Board. Follow the instructions in this section to remove the pigtail and the PET and CT limit switch
cables.
Note: For best results, tilt the ETC mounting tray to access the connectors. Use a flat-blade screwdriver
to unfasten the slotted (captive) screw located bottom center.
1.) Cut the tie-wraps and remove the CT-PET Positions cable from the table.
2.) Refer to Figure 6-19. Follow the cables back to the ETC Board I/F J8 connection.
3.) Disconnect the 15 pin D-Type Connector from J8 of the ETC I/F board.
Figure 6-19: ETC Board Locations
4.) Cut the existing cable from the J8 connector, and pull out the CT-PET positions cable.
5.) Fasten a piece of tape over the remaining 15 pin D-Type connector.
J13
J10
J4
J24
J7
J8
ETC I/F Board (Piggyback)

Table of Contents

Related product manuals